Recent Projects

Embarking on a transformative journey at The Pinnacle on Grace Bay

TTHI executed a comprehensive remodeling endeavor, redefining luxury living with unparalleled sophistication and functionality. The project commenced with the meticulous demolition of all marble floor tiles, kitchen fixtures, bathroom walls, and fixtures, setting the stage for a complete rejuvenation of the space.

Embracing contemporary design trends, TTHI expertly installed 48×48 porcelain concrete look tiles, infusing the interiors with a chic and modern aesthetic. The kitchen was meticulously crafted with large format porcelain slabs, adorning the backsplash and countertops of both cabinets and island, boasting a sleek waterfall edge and a stylish dry bar.

Efficiency and comfort were prioritized with the installation of ducting and an air handler for a new central HVAC system, ensuring optimal climate control throughout the residence. The raised drop ceiling was elevated to new heights, complemented by the installation of modern ceiling-flushed LED lights, casting a warm and inviting glow across the space.

Luxury extended to every corner of the home, with large format porcelain slab countertops adorning vanities and exquisite wall and floor tiles enhancing the master showers and guest bathrooms, complete with modern linear drains for seamless drainage. The meticulous installation of MEP systems, paint finishes, and the remodeling of existing doors with upgraded hardware showcased TTHI’s unwavering commitment to quality craftsmanship.

Embracing the future of home automation, TTHI integrated an audio system and upgraded electrical switches and plugs to SMART systems, seamlessly blending convenience with sophistication. With meticulous attention to detail and a dedication to exceeding expectations, TTHI has redefined luxury living at The Pinnacle on Grace Bay, setting a new standard of excellence in remodeling and design.

Project Details

Date

Oct 2023

Service Provided

Remodeling

Category

Residential

Location

Grace Bay, Providenciales

Duration

6 months

Other Projects